I have really enjoyed in your class. Your teaching style is clear, engaging and well-structured, which has helped me understand the material better.
Overview
Delay Analysis & Extension of Time under FIDIC: A Complete 5-Day Professional Programme
COURSE OVERVIEW
Delays are a common challenge in FIDIC-based projects, often leading to disputes, cost overruns, and performance issues. This 5-day professional programme equips participants with the knowledge and practical skills to analyze delays, determine entitlement to extensions of time, and mitigate schedule risks under Red, Yellow, Silver, and Gold Book contracts.
The course combines critical path analysis, claims management, real-world case studies, and interactive exercises to help participants manage project timelines effectively.
KEY BENEFITS
Participants will:
* Master FIDIC clauses related to delays and extension of time
* Analyze project schedules and determine entitlement to EOT
* Prepare compliant, well-documented extension claims
* Reduce disputes and improve project delivery timelines
* Gain hands-on experience with delay analysis tools and templates
* Learn from real-world project case studies and practical exercises
CERTIFICATION
Certification Title:
Certified Specialist in FIDIC Delay Analysis & Extension of Time
*Issued by KE Leaders International Training Centre*
Includes:
✔ International Certification
✔ Digital Badge
✔ CPD Hours
✔ Delay Analysis & EOT Templates
✔ Case Study Workbook
Objectives
COURSE OBJECTIVES
By the end of this programme, participants will be able to:
1. Understand FIDIC clauses related to delays and extension of time (EOT)
2. Identify causes of delays and classify critical vs non-critical delays
3. Apply delay analysis techniques such as CPM, As-Planned vs As-Built, and Time Impact Analysis
4. Prepare and submit extension of time claims in compliance with FIDIC requirements
5. Integrate delay analysis with claims, variations, and project reporting
6. Coordinate with Engineers, Employers, and Contractors on schedule issues
7. Prevent disputes and improve project delivery timelines
8. Learn from real-world case studies and best practices
Outline
5-DAY DETAILED COURSE OUTLINE
DAY 1 — Introduction to Delays under FIDIC
* Overview of delay-related clauses in FIDIC Red, Yellow, Silver & Gold Books
* Types of delays: excusable, compensable, and concurrent delays
* Roles of Employer, Contractor, and Engineer in delay management
* Impacts of delays on project cost, quality, and schedule
DAY 2 — Delay Analysis Techniques
* Critical Path Method (CPM) and network analysis
* As-Planned vs As-Built and Time Impact Analysis
* Determining float, slippage, and schedule risk
* Tools and software for delay analysis
DAY 3 — Extensions of Time (EOT)
* FIDIC procedures for entitlement to EOT
* Notices, substantiation, and claim preparation
* Assessment of concurrent delays and impact on project timeline
* Documentation and compliance with contractual requirements
DAY 4 — Integrating Delay Analysis with Claims & Variations
* Linking delays to variations and cost claims
* Coordinating with project documentation and reporting
* Preventing disputes through proactive delay management
* Case studies: lessons from real-world FIDIC projects
DAY 5 — Practical Workshops & Certification
* Hands-on exercises: delay analysis and EOT calculations
* Group simulation: preparing EOT claims and defending against disputes
* Best practices in schedule monitoring and reporting
* Final assessment & certificate issuance
Who should attend
WHO SHOULD ATTEND
* Project Managers & Directors
* Contract Administrators & Engineers
* Planning & Scheduling Engineers
* Quantity Surveyors & Cost Engineers
* Consultants, Contractors, and Subcontractors
* Legal Advisors and Claims Specialists
* Government and donor-funded project teams
Dates & venues
Sessions start on the first and third Monday of each month, listed through Dec 2027. Choose a date to enquire or enrol.
| Dates | Venues | Format |
|---|---|---|
| 7 December 2026 – 11 December 2026 | Dubai, London, Madrid, Paris, Rome | Classroom |
| 4 January 2027 – 8 January 2027 | Dubai, London, Madrid, Paris, Rome | Classroom |
| 18 January 2027 – 22 January 2027 | Dubai, London, Madrid, Paris, Rome | Classroom |
| 1 February 2027 – 5 February 2027 | Dubai, London, Madrid, Paris, Rome | Classroom |
| 15 February 2027 – 19 February 2027 | Dubai, London, Madrid, Paris, Rome | Classroom |
| 1 March 2027 – 5 March 2027 | Dubai, London, Madrid, Paris, Rome | Classroom |
| 15 March 2027 – 19 March 2027 | Dubai, London, Madrid, Paris, Rome | Classroom |
| 5 April 2027 – 9 April 2027 | Dubai, London, Madrid, Paris, Rome | Classroom |
| 19 April 2027 – 23 April 2027 | Dubai, London, Madrid, Paris, Rome | Classroom |
| 17 May 2027 – 21 May 2027 | Dubai, London, Madrid, Paris, Rome | Classroom |
| 7 June 2027 – 11 June 2027 | Dubai, London, Madrid, Paris, Rome | Classroom |
| 21 June 2027 – 25 June 2027 | Dubai, London, Madrid, Paris, Rome | Classroom |
| 5 July 2027 – 9 July 2027 | Dubai, London, Madrid, Paris, Rome | Classroom |
| 19 July 2027 – 23 July 2027 | Dubai, London, Madrid, Paris, Rome | Classroom |
| 2 August 2027 – 6 August 2027 | Dubai, London, Madrid, Paris, Rome | Classroom |
| 16 August 2027 – 20 August 2027 | Dubai, London, Madrid, Paris, Rome | Classroom |
| 6 September 2027 – 10 September 2027 | Dubai, London, Madrid, Paris, Rome | Classroom |
| 20 September 2027 – 24 September 2027 | Dubai, London, Madrid, Paris, Rome | Classroom |
| 4 October 2027 – 8 October 2027 | Dubai, London, Madrid, Paris, Rome | Classroom |
| 18 October 2027 – 22 October 2027 | Dubai, London, Madrid, Paris, Rome | Classroom |
| 1 November 2027 – 5 November 2027 | Dubai, London, Madrid, Paris, Rome | Classroom |
| 15 November 2027 – 19 November 2027 | Dubai, London, Madrid, Paris, Rome | Classroom |
| 6 December 2027 – 10 December 2027 | Dubai, London, Madrid, Paris, Rome | Classroom |
Duration: 5 Days
What participants say
Google reviews
This product page has no course-specific reviews. The comments below are Google reviews of KE Leaders shown on the current homepage, verified via Trustindex as originating from Google — they are reviews of KE Leaders, not of this course alone.
I just wanted to take a moment to sincerely thank you to Dr. Muhammad Kamran. It has been incredibly helpful, not just in terms of the content, but also in the way you delivered it with such clarity, passion, and positive energy.
Amazing experience. Learning journey made easy and organised. Sharing practical ways on how to tackle situations.
Wonderful experience full of very top quality information. Definitely recommend everyone to start the course.
Ready to plan this course?
Speak with an advisor about this programme. We are in Ilford, London, and train internationally.


