FIDIC contracts, usually amended 1999 Red, Yellow or Silver Book forms rather than the 2017 suite, are one of the most common construction contract frameworks on Saudi Vision 2030 infrastructure and giga-projects, including work for Public Investment Fund (PIF) developers such as NEOM and Qiddiya. Contract teams should treat the printed FIDIC general conditions as a starting point only, then read the particular conditions against Saudi law, especially the Civil Transactions Law of December 2023, Sharia limits on interest, decennial liability, local-content rules and the dispute forum, which is often the Saudi Center for Commercial Arbitration (SCCA).
Why FIDIC still sits at the centre of Vision 2030 contracting
Saudi Arabia has used FIDIC-based public works conditions for decades. Pinsent Masons notes that the Public Works Contract approved for Saudi government authorities since 1988 was largely based on the FIDIC Conditions of Contract, 3rd edition, published in 1977, and that FIDIC remains one of the most common construction contract forms in the Kingdom today: https://www.pinsentmasons.com/out-law/guides/using-fidic-construction-contracts-in-saudi-arabia. The same guide records that the 1999 editions, not the later 2017 suite, have been adopted on many Vision 2030 major infrastructure projects.
That long practice matters for middle and senior managers. A bid package that looks like a familiar Red or Yellow Book is rarely the unamended FIDIC text. Most contracts use amended general conditions, or particular conditions stacked on the standard form, plus mandatory Saudi law requirements. Teams that administer the printed book without checking those amendments will miss notice periods, payment terms, design risk and dispute routes that no longer match the standard clause numbers they trained on.
Which Vision 2030 programmes use FIDIC forms
The official PIF giga-projects page lists five programmes designed to stimulate and diversify the economy: NEOM, Qiddiya, Red Sea Global, ROSHN Group and Diriyah Company: https://www.pif.gov.sa/en/our-investments/giga-projects/. PIF describes NEOM as covering 26,500 square kilometres and planned to operate entirely on renewable energy. Qiddiya City, led by Qiddiya Investment Company and launched in 2018, spans more than 360 square kilometres as an entertainment, sports and culture destination. Red Sea Global, also launched in 2018, is developing The Red Sea and Amaala; PIF states that The Red Sea covers 28,000 square kilometres and that visitor numbers will be capped at one million a year by 2030. ROSHN is a multi-asset real estate developer supporting the Housing and Quality of Life programmes. Diriyah Company, launched in 2023, is developing Diriyah, including a UNESCO World Heritage Site.
Pinsent Masons reports that the 1999 FIDIC contract has been used on NEOM, including The Line, Trojena and Oxagon, and on the New Murabba and Qiddiya projects in Riyadh. Earlier 1999-form projects it names include the Haramain High Speed Rail, contracts entered into by PIF and the Ministry of Transport, and the Mecca Metro and Riyadh Metro. Saudi Vision 2030’s own Public Investment Fund Program page also lists NEOM, ROSHN, the Red Sea project, Qiddiya and Diriyah as the five giga-projects under that programme: https://www.vision2030.gov.sa/en/explore/programs/public-investment-fund-program.
These are large, multi-package programmes, not a single standard contract. Employers, consultants and contractors still need to check the form actually issued for each package.
Red, Yellow and Silver Books on giga-project packages
In broad terms, the FIDIC Red Book is for construction works designed by the employer, the Yellow Book is for plant and design-build works designed by the contractor to the employer’s requirements, and the Silver Book is for EPC/turnkey projects in which the contractor takes a heavier share of design, procurement and construction risk. Package selection should follow who holds the design and who can actually manage ground, interface and performance risk, not a habit of pushing every package onto a turnkey form.
On Vision 2030 work, managers should also expect particular conditions to move risk away from the unamended book: tighter notices, altered payment and retention, changed variation rules, and a different dispute pathway. Those amendments, not the cover page that says “FIDIC”, decide whether a delay, a late drawing or a change in employer’s requirements is a claim or an absorbed cost.
Saudi law that rewrites standard FIDIC clauses
The Civil Transactions Law (CTL), introduced in December 2023, is the Kingdom’s first comprehensive civil code of this kind and applies to commercial and construction contracts. Pinsent Masons highlights several interactions that contract managers should build into reviews and training.
Good faith and abuse of rights. Article 95 requires a contract to be performed in accordance with its terms and in a manner consistent with good faith. Article 29 provides that a person may not exercise a right in an abusive manner. FIDIC’s rainbow suite does not itself contain an express good-faith clause, but these CTL duties still apply.
Liquidated damages. Article 178 allows parties to pre-agree damages for specified breaches, except where the obligation is to pay a sum of money, which is why late-payment interest is treated differently. Article 179, a mandatory provision that parties cannot opt out of, means liquidated damages are not payable if the obligor proves there was no actual damage, and Saudi courts may reduce an excessive sum or a sum where the obligation was only partly performed. Courts may also increase the sum to match actual damage where fraud or gross negligence caused the loss to exceed the agreed figure.
Financing charges. Unamended FIDIC Sub-Clause 14.8 entitles the contractor to financing charges for delayed payment. Saudi FIDIC contracts often remove that wording because of the Sharia prohibition of riba (interest). Pinsent Masons notes that this prohibition has survived the CTL, and that any such provision would likely be unenforceable in the Kingdom. Parties sometimes try to draft lawful compensation for loss caused by late payment instead; that is a legal-drafting exercise, not a reason to leave a standard interest clause in place.
Decennial and latent-defect liability. Many FIDIC-based contracts in the Kingdom add wording intended to reflect decennial liability under article 29 of the Saudi Building Code Implementing Regulations. The designer or supervising engineer and the contractor can be jointly liable for ten years from completion for total or partial collapse and for hidden defects that threaten durability and safety. Some contracts go further and impose a broader contractual latent-defect period. That is often heavier than the statutory rule, which focuses on serious defects.
Change in circumstances. The 2017 suite uses Clause 18 (Exceptional Events) in place of the 1999 force majeure clause. Separately, article 97 of the CTL addresses extraordinary unforeseen circumstances and can be broader than FIDIC relief. It allows an obligor to seek renegotiation where unforeseen events make performance unduly onerous and threaten exorbitant loss, while still requiring the obligor to continue performing. If renegotiation fails, a court may restore the obligation to a reasonable level.
Dispute resolution, local content and day-to-day administration
Pinsent Masons reports that most, but not all, recent Saudi FIDIC-based contracts it has seen remove the dispute adjudication board and provide for final dispute resolution by arbitration under the rules of the Saudi Center for Commercial Arbitration in Riyadh. Managers should not assume a standing DAB or DAAB exists, and they should diary the actual notice and referral steps in the particular conditions.
Most contracts now also reflect Local Content Law requirements administered by the Local Content and Government Procurement Authority (LCGPA). Pinsent Masons describes two common types: a local-content score based on the value of local labour, goods, services, materials, equipment, assets and technology, or a national-product procurement requirement with a price preference for Saudi products. Those requirements are not always strict pass/fail obligations, and contractors may be able to avoid liability if they can show why compliance was not possible. They still belong in the mobilisation plan, procurement strategy and monthly reporting, not only in the legal appendix.
For government-funded work, contract administration also has to sit beside the Government Tenders and Procurement Law. A new law was published on 4 September 2026 and is due to take effect on 2 January 2027, replacing the 2019 law. Baker McKenzie summarises changes that will affect variation headroom, delay fines, Ministry of Finance review times and outstanding payments: https://www.bakermckenzie.com/en/insight/publications/2026/10/saudi-arabia-key-changes-under-new-government-procurement-law. Those rules are covered in a companion KE Leaders article on contract management under the new procurement law. They are not a substitute for reading the FIDIC particular conditions, but they do constrain how a government employer can vary, sanction and pay a contract.
What managers should do before the next tender or progress meeting
Read the particular conditions against the unamended book and produce a short departure schedule for notices, variations, payment, delay damages, exceptional events and disputes. Confirm whether the contract is a 1999 or 2017 form; many Vision 2030 packages still use 1999. Align site diaries, early warnings and claim notices with the actual time-bars, not with classroom memory of Sub-Clause 20.1 or 20.2. Check that payment provisions do not rely on unenforceable interest, and that decennial or latent-defect wording is understood by the delivery and insurance teams. Build LCGPA local-content evidence into procurement files from day one. Train the employer’s representative, the contractor’s commercial team and, where one exists, the engineer on the same departure schedule so determinations are made against the contract that was signed.
KE Leaders is a CIPS and ATHE approved training centre in Ilford, London, working with public- and private-sector managers across the GCC. The courses below are designed for the people who administer these contracts, not only for lawyers.
Related KE Leaders courses
- Professional Diploma in FIDIC Claim and Contract Management
- Advanced Certificate in Claims and Dispute Resolution under FIDIC Contracts
- FIDIC Employer’s Representative (ER) Certification
Frequently Asked Questions
Is FIDIC the mandatory contract form for all Vision 2030 projects?
No official source reviewed for this article states that FIDIC is mandatory on every Vision 2030 package. Pinsent Masons describes FIDIC as one of the most common forms in Saudi Arabia and records 1999-form use on named projects including NEOM, Qiddiya and New Murabba. Some employers also issue heavily amended or bespoke conditions. Always check the tender form.
Are Vision 2030 projects using FIDIC 2017 or 1999?
Pinsent Masons reports that most FIDIC contracts used in the Kingdom are based on the 1999 suite rather than the 2017 suite, including recent use on NEOM, New Murabba and Qiddiya. Individual packages can differ, so the document set governs.
Can a contractor claim financing charges for late payment under FIDIC in Saudi Arabia?
Usually not in the unamended form. Sub-Clause 14.8 is commonly removed because of the Sharia prohibition of riba, and Pinsent Masons says a standard financing-charge clause would likely be unenforceable. Any alternative compensation wording should be reviewed under the Civil Transactions Law.
Do dispute adjudication boards still apply?
Often not. Pinsent Masons reports that most recent Saudi FIDIC-based contracts it has seen remove the DAB and provide for SCCA arbitration in Riyadh. Some contracts still differ, so the dispute clause must be checked package by package.
Does the Civil Transactions Law override the FIDIC contract?
The signed contract still matters, but mandatory CTL provisions cannot be contracted out of. Pinsent Masons flags article 179 on liquidated damages as mandatory, and notes good-faith, abuse-of-rights, liability and unforeseen-circumstances rules that will apply alongside the FIDIC text.
Sources
- Using FIDIC construction contracts in Saudi Arabia (Pinsent Masons)
- PIF Giga-Projects
- Public Investment Fund Program (Saudi Vision 2030)
- Key changes under new Government Procurement Law (Baker McKenzie)
Talk to KE Leaders
KE Leaders Training Centre can help your team apply FIDIC practice to Vision 2030 and wider GCC projects. Email admin@keleaders.com, call 0044 7901 259494, or WhatsApp 0044 740 561 9940. This article is general training guidance, not legal advice. Always take advice on the contract in front of you and on the official Saudi legal texts.