{"id":6003,"date":"2025-09-11T15:30:36","date_gmt":"2025-09-11T15:30:36","guid":{"rendered":"https:\/\/keleaders.com\/?post_type=product&#038;p=6003"},"modified":"2026-02-28T02:42:11","modified_gmt":"2026-02-28T02:42:11","slug":"optimising-project-success-through-cost-estimation-and-value-engineering","status":"publish","type":"product","link":"https:\/\/keleaders.com\/ar\/product\/optimising-project-success-through-cost-estimation-and-value-engineering\/","title":{"rendered":"Optimising Project Success through Cost Estimation and Value Engineering"},"content":{"rendered":"<h2><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Optimising Project Success through Cost Estimation and Value Engineering: Complete Guide<\/span><\/strong><\/h2>\n<p>&nbsp;<\/p>\n<h3><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Introduction<\/span><\/strong><\/h3>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">The decision to proceed with a project is often based almost exclusively on early conceptual cost estimates, which form the basis for cash flow projections and budget forecasts during the feasibility study. Unreliable estimates often result in significant overruns, leading to financial losses and compromised quality.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">As potential projects are considered, organisations seek both **<a href=\"https:\/\/keleaders.com\/?post_type=product&amp;p=6003&amp;preview=true\">accurate cost estimates<\/a>** and **opportunities to optimise life-cycle costs** while maintaining functionality and quality. Choosing the correct estimating method at each project stage is essential, alongside the systematic application of **value engineering** to enhance overall project value.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">This course equips delegates with the skills to:<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Accurately estimate project costs.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Eliminate unnecessary expenses.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Link estimates to procurement methods.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Apply value engineering to improve project return on investment (ROI).<\/span><\/p>\n<h3><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Objectives<\/span><\/strong><\/h3>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">By the end of this course, participants will be able to:<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Gain knowledge of techniques used in project estimating, from conceptual to detailed stages.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Understand the types of estimates for progressive project cost accuracy.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Identify contract types and risk allocation between parties.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Apply incentive arrangements to achieve optimal outcomes.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Grasp the core principles of Value Engineering (VE).<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Apply VE to ensure good practice across the project development process.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Define and develop project scope with stakeholder input.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Organise cost-relevant project information effectively.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Report persuasively to management and stakeholders on value alternatives.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Apply life-cycle costing to maximise project success.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Objectively evaluate and present alternatives that enhance project value.<\/span><\/p>\n<h3><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Content<\/span><\/strong><\/h3>\n<p><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Day One \u2013 Cost Estimating Basics<\/span><\/strong><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Basic Project Management definitions<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Cost Selection Methods<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Key project terminology &amp; preparing for success<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Project Cost Management and Cost Control<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Resource &amp; Cost Allocation<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Inputs to Cost Estimation in Project Management<\/span><\/p>\n<p><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Day Two \u2013 Pricing, Contracts and Risk<\/span><\/strong><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Inputs to Cost Budgeting<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Resource Requirements<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Direct &amp; Indirect Project Costs<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Probability and Standard Deviation Formulae<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Contract Types and Risk Distribution<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Fixed Price Contracts &amp; Cost-Plus Contracts<\/span><\/p>\n<p><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Day Three \u2013 Developing the Project Budget &amp; Cost Control<\/span><\/strong><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Risk Identification, Analysis &amp; Management<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Qualitative Risk Analysis<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Quantitative Risk Analysis<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Risk &amp; Probability Matrix<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Risk Response Strategies<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Cash Flow Management<\/span><\/p>\n<p><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Day Four \u2013 Approximate &amp; Detailed Estimating Methods<\/span><\/strong><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Material Estimating<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Civil\/Construction Estimating<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Labour Estimating with Crews<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Detailed Estimating Techniques<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Procurement Management<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Risk Distribution in Contracting<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Project Risk Profiles<\/span><\/p>\n<p><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Day Five \u2013 Advanced Estimating Methods<\/span><\/strong><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Building Information Modeling (BIM) for Estimating<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Cost Estimating Relationships (CER)<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Computer-Aided Estimating<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Control Charts for Monitoring and Estimating<\/span><\/p>\n<p><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Day Six \u2013 Framework for Applying Value Engineering in Projects<\/span><\/strong><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Definition of Value and VE Principles<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Timing and Application of VE in Projects<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Stakeholder Analysis and Management for Project Definition<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Team Player Styles in VE<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Understanding Value, Cost, and Worth Relationships<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Overview of VE Phases<\/span><\/p>\n<p><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Day Seven \u2013 The Function Analysis Phase<\/span><\/strong><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Information Phase: Steps and Procedures<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Developing a Value Engineering Job Plan<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Defining Project Constraints<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Function-Cost-Worth Analysis<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* FAST Diagrams for Critical Project Components<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Cross-Functional Team Collaboration in VE<\/span><\/p>\n<p><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Day Eight \u2013 The Creative Phase<\/span><\/strong><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Inspiring Creativity in Project Teams<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Creative Thinking Techniques in VE<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Reaching Consensus through Collaboration<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Risk Perception and Identification in Projects<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Paired Comparison Method for Prioritization<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Outputs of the Creative Phase<\/span><\/p>\n<p><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Day Nine \u2013 The Evaluation Phase<\/span><\/strong><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Evaluation Methods in Projects<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Project Risk and Scenario Analyses<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Life-Cycle Costing Techniques<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Incremental Benefit-Cost Analysis for Decision-Making<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Effective Decision-Making in Project Environments<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Outputs of the Evaluation Phase<\/span><\/p>\n<p><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Day Ten \u2013 The Planning and Reporting Phases<\/span><\/strong><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Developing and Assessing VE Proposals<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Action Planning: Roles and Responsibilities<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Reporting VE Findings to Senior Management and Stakeholders<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Incorporating VE Early in Project Phases<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Integrating VE with Continuous Improvement Approaches<\/span><\/p>\n<h3><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>Training Methodology<\/strong><\/span><\/h3>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">This programme uses a **highly interactive approach** that combines theory with practice to ensure participants gain maximum benefit. The methodology includes:<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">Lectures &amp; Expert Insights \u2013 Clear explanation of key principles in cost estimation, budgeting, and value engineering.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">Case Studies &amp; Real-Life Examples \u2013 Learning from practical industry applications.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">Hands-on Workshops \u2013 Applying cost estimating and VE techniques step by step.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">Group Discussions &amp; Team Exercises \u2013 Enhancing creativity, collaboration, and decision-making skills.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">Simulation &amp; Tools Practice \u2013 Using project management and estimating software to develop practical proficiency.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">Action Learnin \u2013 Participants will work on live project scenarios to link learning with their own workplace.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">This blend of methods ensures delegates walk away with **practical tools, frameworks, and confidence** to optimise project success in their own organisations.<\/span><\/p>\n<h3><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>Who Should Attend<\/strong><\/span><\/h3>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">This course is designed for professionals involved in **project cost management, procurement, and value optimisation, including but not limited to:<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">Project Managers &amp; Team Leaders<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">Cost Estimators &amp; Cost Engineers<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">Planning &amp; Scheduling Engineers<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">Procurement &amp; Contract Management Specialists<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">Quantity Surveyors &amp; Construction Professionals<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">Financial Analysts &amp; Budget Controllers<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">Engineers and Technical Staff involved in project planning and execution<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">Executives &amp; Decision-Makers seeking to improve project value through cost management and VE<\/span><\/p>\n<h3><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>Enquiries and Registration<\/strong><\/span><\/h3>\n<p><span style=\"font-size: 16px; font-family: arial, helvetica, sans-serif;\">Enquiry at : admin@keleaders.com<\/span><br \/>\n<span style=\"font-size: 16px; font-family: arial, helvetica, sans-serif;\">Whatsapp: 0044 790 125 9494<\/span><br \/>\n<span style=\"font-size: 16px; font-family: arial, helvetica, sans-serif;\">For more details visit our website : www.keleaders.com<\/span><\/p>\n<p><span style=\"font-size: 16px; font-family: arial, helvetica, sans-serif;\"><div class=\"wpforms-container wpforms-container-full wpforms-render-modern\" id=\"wpforms-2255\"><form id=\"wpforms-form-2255\" class=\"wpforms-validate wpforms-form wpforms-ajax-form\" data-formid=\"2255\" method=\"post\" enctype=\"multipart\/form-data\" action=\"\/ar\/wp-json\/wp\/v2\/product\/6003\" data-token=\"12800b2bc8b300ad211a7b515d4346cc\" data-token-time=\"1778428388\"><noscript class=\"wpforms-error-noscript\">Please enable JavaScript in your browser to complete this form.<\/noscript><div class=\"wpforms-hidden\" id=\"wpforms-error-noscript\">Please enable JavaScript in your browser to complete this form.<\/div><div class=\"wpforms-field-container\"><div id=\"wpforms-2255-field_1-container\" class=\"wpforms-field wpforms-field-name\" data-field-id=\"1\"><fieldset><legend class=\"wpforms-field-label\">Name <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/legend><div class=\"wpforms-field-row wpforms-field-large\"><div class=\"wpforms-field-row-block wpforms-first wpforms-one-half\"><input type=\"text\" id=\"wpforms-2255-field_1\" class=\"wpforms-field-name-first wpforms-field-required\" name=\"wpforms[fields][1][first]\" aria-errormessage=\"wpforms-2255-field_1-error\" required><label for=\"wpforms-2255-field_1\" class=\"wpforms-field-sublabel after\">First<\/label><\/div><div class=\"wpforms-field-row-block wpforms-one-half\"><input type=\"text\" id=\"wpforms-2255-field_1-last\" class=\"wpforms-field-name-last wpforms-field-required\" name=\"wpforms[fields][1][last]\" aria-errormessage=\"wpforms-2255-field_1-last-error\" required><label for=\"wpforms-2255-field_1-last\" class=\"wpforms-field-sublabel after\">Last<\/label><\/div><\/div><\/fieldset><\/div><div id=\"wpforms-2255-field_10-container\" class=\"wpforms-field wpforms-field-phone\" data-field-id=\"10\"><label class=\"wpforms-field-label\" for=\"wpforms-2255-field_10\">Phone<\/label><input type=\"tel\" id=\"wpforms-2255-field_10\" class=\"wpforms-field-large\" data-rule-int-phone-field=\"true\" name=\"wpforms[fields][10]\" aria-label=\"Phone\" aria-errormessage=\"wpforms-2255-field_10-error\" ><\/div><div id=\"wpforms-2255-field_2-container\" class=\"wpforms-field wpforms-field-email\" data-field-id=\"2\"><label class=\"wpforms-field-label\" for=\"wpforms-2255-field_2\">Email <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/label><input type=\"email\" id=\"wpforms-2255-field_2\" class=\"wpforms-field-large wpforms-field-required\" name=\"wpforms[fields][2]\" spellcheck=\"false\" aria-errormessage=\"wpforms-2255-field_2-error\" required><\/div><div id=\"wpforms-2255-field_17-container\" class=\"wpforms-field wpforms-field-select wpforms-field-select-style-classic\" data-field-id=\"17\"><label class=\"wpforms-field-label\" for=\"wpforms-2255-field_17\">Location<\/label><select id=\"wpforms-2255-field_17\" class=\"wpforms-field-large\" name=\"wpforms[fields][17]\"><option value=\"Dubai\" >Dubai<\/option><option value=\"London\" >London<\/option><option value=\"Madrid\" >Madrid<\/option><option value=\"Paris\" >Paris<\/option><option value=\"Rome\" >Rome<\/option><\/select><\/div><div id=\"wpforms-2255-field_7-container\" class=\"wpforms-field wpforms-field-textarea\" data-field-id=\"7\"><label class=\"wpforms-field-label\" for=\"wpforms-2255-field_7\">Enquiry<\/label><textarea id=\"wpforms-2255-field_7\" class=\"wpforms-field-medium\" name=\"wpforms[fields][7]\" aria-errormessage=\"wpforms-2255-field_7-error\" ><\/textarea><\/div><\/div><!-- .wpforms-field-container --><div class=\"wpforms-submit-container\" ><input type=\"hidden\" name=\"wpforms[id]\" value=\"2255\"><input type=\"hidden\" name=\"page_title\" value=\"\"><input type=\"hidden\" name=\"page_url\" value=\"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/product\/6003\"><button type=\"submit\" name=\"wpforms[submit]\" id=\"wpforms-submit-2255\" class=\"wpforms-submit\" data-alt-text=\"Sending...\" data-submit-text=\"Submit\" aria-live=\"assertive\" value=\"wpforms-submit\">Submit<\/button><img decoding=\"async\" src=\"https:\/\/keleaders.com\/wp-content\/plugins\/wpforms\/assets\/images\/submit-spin.svg\" class=\"wpforms-submit-spinner\" style=\"display: none;\" width=\"26\" height=\"26\" alt=\"Loading\"><\/div><\/form><\/div>  <!-- .wpforms-container --><\/span><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Optimising Project Success through Cost Estimation and Value Engineering: Complete Guide &nbsp; Introduction The decision to proceed with a project [&hellip;]<\/p>\n","protected":false},"featured_media":1885,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}}},"product_brand":[],"product_cat":[44],"product_tag":[],"class_list":{"0":"post-6003","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-project-management","7":"desktop-align-left","8":"tablet-align-left","9":"mobile-align-left","11":"first","12":"instock","13":"shipping-taxable","14":"purchasable","15":"product-type-simple"},"acf":[],"_links":{"self":[{"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/product\/6003","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/comments?post=6003"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/media\/1885"}],"wp:attachment":[{"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/media?parent=6003"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/product_brand?post=6003"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/product_cat?post=6003"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/product_tag?post=6003"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}