{"id":6001,"date":"2025-09-11T15:13:32","date_gmt":"2025-09-11T15:13:32","guid":{"rendered":"https:\/\/keleaders.com\/?post_type=product&#038;p=6001"},"modified":"2025-09-11T15:13:32","modified_gmt":"2025-09-11T15:13:32","slug":"project-success-blueprint","status":"publish","type":"product","link":"https:\/\/keleaders.com\/ar\/product\/project-success-blueprint\/","title":{"rendered":"Project Success Blueprint"},"content":{"rendered":"<h2><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Project Success Blueprint: Scheduling and Cost Estimation<\/span><\/strong><\/h2>\n<p>&nbsp;<\/p>\n<h3><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Course Overview<\/span><\/strong><\/h3>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">The late delivery of projects has become the scourge of project professionals worldwide. Many <a href=\"https:\/\/keleaders.com\/?post_type=product&amp;p=6001&amp;preview=true\">projects<\/a> in both the private and public sectors significantly overrun in schedule and budget, resulting in financial losses and failure to meet strategic objectives.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">The root cause is often the inability of professionals to properly apply modern tools and techniques of project planning, scheduling, control, and cost estimating. Equally critical is the development of reliable cost estimates during the conceptual and design stages, as these form the foundation of feasibility studies, cash flow forecasts, and project decision-making.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">This intensive 10-day program provides participants with the necessary skills to accurately plan, schedule, and estimate project costs at both conceptual and detailed levels. Through proven methodologies, case studies, and workshops, delegates will be equipped to deliver projects on time, within budget, and to the required quality standards.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">This Course Will Feature<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Practical techniques for project planning, scheduling, and control<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Methods to develop reliable conceptual and detailed cost estimates<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Earned value analysis for tracking project performance<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Approaches to manage project risks and sustain momentum<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Effective progress monitoring, schedule acceleration, and lean techniques<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Understanding contract types, cost arrangements, and risk allocation<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Application of quality planning and cost-of-quality principles<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Hands-on workshops to apply tools and techniques in real scenarios<\/span><\/p>\n<h3><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Objectives<\/span><\/strong><\/h3>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">By the end of this programme, participants will be able to:<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Gain knowledge of techniques used in resource planning and control<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Understand time-cost trade-offs in project delivery<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Identify risk sources, minimize their impact, and sustain project momentum<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Administer project documentation and reporting effectively<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Develop performance monitoring and control systems<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Apply estimating techniques from conceptual to detailed levels<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Recognize and apply different types of cost estimates and contracts<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Use incentive arrangements to maximize results from contracts<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Apply earned value management for project performance control<\/span><\/p>\n<h3><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Course Content<\/span><\/strong><\/h3>\n<p><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Day One \u2013 Project Scope Planning and Definitions (Fundamentals)<\/span><\/strong><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Introduction to Project Management<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Scope Planning<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Work Packages<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Scope Execution Plan<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Triple Constraints \u2013 Time, Cost, Scope<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Project Delivery Systems<\/span><\/p>\n<p><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Day Two \u2013 Project Schedule Planning<\/span><\/strong><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Economic Evaluation and Impact of Interest Rates<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Work Breakdown Structures (WBS)<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Project Estimating<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Gantt Chart \u2013 Schedule Baseline<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Precedence Network Diagramming<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Building Schedule Logic<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Understanding Float<\/span><\/p>\n<p><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Day Three \u2013 Critical Path and Network Scheduling<\/span><\/strong><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Activity Development<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Network Calculations<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Forward and Backward Pass<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Lead and Lag Scheduling<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Program Evaluation and Review Technique (PERT)<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Time-Cost-Scope Trade-off<\/span><\/p>\n<p><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Day Four \u2013 Advanced Planning Methods and Project Control<\/span><\/strong><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Preparing a Line of Balance Schedule (LSM)<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Project Control Systems<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Earned Value Analysis<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Earned Value Reporting<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Resource Allocation Algorithms for Resource Prioritization<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Time and Cost Trade-off<\/span><\/p>\n<p><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Day Five \u2013 Progress Reporting and Schedule Acceleration<\/span><\/strong><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Progress Tracking and Monitoring<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Options for Accelerating the Schedule<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Crashing the Schedule\u2014How?<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Lean Approaches<\/span><\/p>\n<p><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Day Six \u2013 Cost Estimating Basics<\/span><\/strong><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Basic Project Management Definitions<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Cost Selection Methods<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Typical Project Terminology &amp; Setting up for Success<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Project Cost Management<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Cost Estimation<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Cost Budgeting<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Cost Control<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Triple Constraints \u2013 Time, Cost, Scope<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Project Management Inputs to Cost Estimation<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Resource and Cost Allocation<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* **Workshop**<\/span><\/p>\n<p><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Day Seven \u2013 Developing the Project Budget &amp; Cost Control<\/span><\/strong><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Project Management Inputs to Cost Budgeting<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Resource Requirements<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Direct &amp; Indirect Project Costs<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* PERT, Probability, and Standard Deviation Formulae<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Calculating the Standard Deviation<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Earned Value Control Process<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Schedule Variances<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Earned Value Analysis<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Earned Value Reporting<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Project Variance Analysis and Quantification<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Schedule Performance Index (SPI)<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Cost Performance Index (CPI)<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Estimate at Completion (EAC)<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Estimate to Complete (ETC)<\/span><\/p>\n<p><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Day Eight \u2013 Managing Cost Risk<\/span><\/strong><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Risk Analysis &amp; Management<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Risk Identification<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Qualitative Risk Analysis<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Quantitative Risk Analysis<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Risk &amp; Probability Matrix<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Risk Response Strategy<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Contingency Reserve<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Watch List<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Acceptance Strategy<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* The S-Curve for Risk &amp; Cost<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* **Workshop**<\/span><\/p>\n<p><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Day Nine \u2013 Contract Types &amp; Compensation Arrangements<\/span><\/strong><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Procurement Management<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Make-or-Buy Analysis<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Procurement Documents<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Contract Types<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Risk Distribution in Contracting<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Project Risk Profiles<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Contract Types According to Risk Distribution<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Fixed Price Contracts<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Firm Fixed Price<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Fixed Price with Economic Adjustment<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Incentive Contracts<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Fixed Price Incentive<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Cost Plus Incentive<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Cost-Plus Contracts<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Cost Reimbursement<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Cost Plus Award Fee<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Cost Plus Fixed Fee<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Time-and-Materials<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* **Workshop**<\/span><\/p>\n<p><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Day Ten \u2013 Cost of Quality<\/span><\/strong><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Quality Planning &amp; Assurance<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Quality Control<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Benchmarking<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Pareto Analysis<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Cause &amp; Effect \u2013 Fishbone<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Control Chart<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Quality &amp; Grade<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* **Workshop**<\/span><\/p>\n<h3><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Training Methodology<\/span><\/strong><\/h3>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">This program combines **expert-led lectures, interactive group discussions, case studies, and hands-on workshops**. Practical exercises in scheduling, cost estimating, earned value analysis, and risk management will reinforce learning. Participants will leave with a **personal action plan** to apply directly in their workplace.<\/span><\/p>\n<h3><strong><span style=\"font-family: arial, helvetica, sans-serif;\">Who Should Attend?<\/span><\/strong><\/h3>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">This course is designed for:<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Project Managers and Team Leaders<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Planning &amp; Scheduling Professionals<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Cost Estimators and Cost Engineers<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Project Control Officers<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Contract &amp; Procurement Professionals involved in project costing<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Engineers and Technical Staff managing projects<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Any professional seeking to enhance their project planning, scheduling, and estimating skills<\/span><\/p>\n<h3><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>Enquiries and Registration<\/strong><\/span><\/h3>\n<p><span style=\"font-size: 16px; font-family: arial, helvetica, sans-serif;\">Enquiry at : admin@keleaders.com<\/span><br \/>\n<span style=\"font-size: 16px; font-family: arial, helvetica, sans-serif;\">Whatsapp: 0044 790 125 9494<\/span><br \/>\n<span style=\"font-size: 16px; font-family: arial, helvetica, sans-serif;\">For more details visit our website : www.keleaders.com<\/span><\/p>\n<p><span style=\"font-size: 16px; font-family: arial, helvetica, sans-serif;\"><div class=\"wpforms-container wpforms-container-full wpforms-render-modern\" id=\"wpforms-2255\"><form id=\"wpforms-form-2255\" class=\"wpforms-validate wpforms-form wpforms-ajax-form\" data-formid=\"2255\" method=\"post\" enctype=\"multipart\/form-data\" action=\"\/ar\/wp-json\/wp\/v2\/product\/6001\" data-token=\"12800b2bc8b300ad211a7b515d4346cc\" data-token-time=\"1778431489\"><noscript class=\"wpforms-error-noscript\">Please enable JavaScript in your browser to complete this form.<\/noscript><div class=\"wpforms-hidden\" id=\"wpforms-error-noscript\">Please enable JavaScript in your browser to complete this form.<\/div><div class=\"wpforms-field-container\"><div id=\"wpforms-2255-field_1-container\" class=\"wpforms-field wpforms-field-name\" data-field-id=\"1\"><fieldset><legend class=\"wpforms-field-label\">Name <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/legend><div class=\"wpforms-field-row wpforms-field-large\"><div class=\"wpforms-field-row-block wpforms-first wpforms-one-half\"><input type=\"text\" id=\"wpforms-2255-field_1\" class=\"wpforms-field-name-first wpforms-field-required\" name=\"wpforms[fields][1][first]\" aria-errormessage=\"wpforms-2255-field_1-error\" required><label for=\"wpforms-2255-field_1\" class=\"wpforms-field-sublabel after\">First<\/label><\/div><div class=\"wpforms-field-row-block wpforms-one-half\"><input type=\"text\" id=\"wpforms-2255-field_1-last\" class=\"wpforms-field-name-last wpforms-field-required\" name=\"wpforms[fields][1][last]\" aria-errormessage=\"wpforms-2255-field_1-last-error\" required><label for=\"wpforms-2255-field_1-last\" class=\"wpforms-field-sublabel after\">Last<\/label><\/div><\/div><\/fieldset><\/div><div id=\"wpforms-2255-field_10-container\" class=\"wpforms-field wpforms-field-phone\" data-field-id=\"10\"><label class=\"wpforms-field-label\" for=\"wpforms-2255-field_10\">Phone<\/label><input type=\"tel\" id=\"wpforms-2255-field_10\" class=\"wpforms-field-large\" data-rule-int-phone-field=\"true\" name=\"wpforms[fields][10]\" aria-label=\"Phone\" aria-errormessage=\"wpforms-2255-field_10-error\" ><\/div><div id=\"wpforms-2255-field_2-container\" class=\"wpforms-field wpforms-field-email\" data-field-id=\"2\"><label class=\"wpforms-field-label\" for=\"wpforms-2255-field_2\">Email <span class=\"wpforms-required-label\" aria-hidden=\"true\">*<\/span><\/label><input type=\"email\" id=\"wpforms-2255-field_2\" class=\"wpforms-field-large wpforms-field-required\" name=\"wpforms[fields][2]\" spellcheck=\"false\" aria-errormessage=\"wpforms-2255-field_2-error\" required><\/div><div id=\"wpforms-2255-field_17-container\" class=\"wpforms-field wpforms-field-select wpforms-field-select-style-classic\" data-field-id=\"17\"><label class=\"wpforms-field-label\" for=\"wpforms-2255-field_17\">Location<\/label><select id=\"wpforms-2255-field_17\" class=\"wpforms-field-large\" name=\"wpforms[fields][17]\"><option value=\"Dubai\" >Dubai<\/option><option value=\"London\" >London<\/option><option value=\"Madrid\" >Madrid<\/option><option value=\"Paris\" >Paris<\/option><option value=\"Rome\" >Rome<\/option><\/select><\/div><div id=\"wpforms-2255-field_7-container\" class=\"wpforms-field wpforms-field-textarea\" data-field-id=\"7\"><label class=\"wpforms-field-label\" for=\"wpforms-2255-field_7\">Enquiry<\/label><textarea id=\"wpforms-2255-field_7\" class=\"wpforms-field-medium\" name=\"wpforms[fields][7]\" aria-errormessage=\"wpforms-2255-field_7-error\" ><\/textarea><\/div><\/div><!-- .wpforms-field-container --><div class=\"wpforms-submit-container\" ><input type=\"hidden\" name=\"wpforms[id]\" value=\"2255\"><input type=\"hidden\" name=\"page_title\" value=\"\"><input type=\"hidden\" name=\"page_url\" value=\"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/product\/6001\"><button type=\"submit\" name=\"wpforms[submit]\" id=\"wpforms-submit-2255\" class=\"wpforms-submit\" data-alt-text=\"Sending...\" data-submit-text=\"Submit\" aria-live=\"assertive\" value=\"wpforms-submit\">Submit<\/button><img decoding=\"async\" src=\"https:\/\/keleaders.com\/wp-content\/plugins\/wpforms\/assets\/images\/submit-spin.svg\" class=\"wpforms-submit-spinner\" style=\"display: none;\" width=\"26\" height=\"26\" alt=\"Loading\"><\/div><\/form><\/div>  <!-- .wpforms-container --><\/span><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project Success Blueprint: Scheduling and Cost Estimation &nbsp; Course Overview The late delivery of projects has become the scourge of [&hellip;]<\/p>\n","protected":false},"featured_media":1409,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}}},"product_brand":[],"product_cat":[44],"product_tag":[],"class_list":{"0":"post-6001","1":"product","2":"type-product","3":"status-publish","4":"has-post-thumbnail","6":"product_cat-project-management","7":"desktop-align-left","8":"tablet-align-left","9":"mobile-align-left","11":"first","12":"instock","13":"shipping-taxable","14":"purchasable","15":"product-type-simple"},"acf":[],"_links":{"self":[{"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/product\/6001","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/comments?post=6001"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/media\/1409"}],"wp:attachment":[{"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/media?parent=6001"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/product_brand?post=6001"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/product_cat?post=6001"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/product_tag?post=6001"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}