{"id":6572,"date":"2025-10-25T16:15:17","date_gmt":"2025-10-25T16:15:17","guid":{"rendered":"https:\/\/keleaders.com\/?p=6572"},"modified":"2025-10-25T16:15:17","modified_gmt":"2025-10-25T16:15:17","slug":"understanding-the-colours-of-fidic","status":"publish","type":"post","link":"https:\/\/keleaders.com\/ar\/understanding-the-colours-of-fidic\/","title":{"rendered":"Understanding the Colours of FIDIC"},"content":{"rendered":"<p><span style=\"font-family: arial, helvetica, sans-serif;\">The world of international construction depends on clear communication, fair risk-sharing, and structured project delivery. Yet, projects often face confusion over who is responsible for what, when payments should be made, and how delays should be managed. The **FIDIC Rainbow Suite**\u2014named after the different colors of its contract books\u2014solves this by offering distinct templates for different project types.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">Each color isn\u2019t random. It symbolizes a specific contract philosophy, defining **who designs, who builds, and who bears the risk**. Understanding these colors ensures project teams select the right FIDIC form to match their unique needs, ultimately preventing disputes and promoting success.<\/span><\/p>\n<p>&nbsp;<\/p>\n<h3><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>The Red Book \u2013 The Employer\u2019s Design<\/strong><\/span><\/h3>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">The **FIDIC Red Book** is the most widely used among all FIDIC contracts. It is officially known as the **\u201cConditions of Contract for Construction\u201d**.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">This version suits projects where the **employer provides the design**, and the **contractor executes the work** based on those specifications.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>Key Features<\/strong><\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* The **Employer designs**, and the **Contractor builds**.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* The **Engineer** plays a central role\u2014acting as the neutral authority between both parties.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Payments are typically made on the **basis of measured work** (re-measurement contract).<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Best suited for **traditional construction projects** such as roads, bridges, and infrastructure works funded by public agencies.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>Risk Allocation<\/strong><\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">Risks are **balanced but employer-led**. The employer bears risks linked to design accuracy and site data, while the contractor is responsible for executing the works correctly and safely.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>Ideal For<\/strong><\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Public infrastructure projects<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Government-funded developments<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Scenarios where design is finalized before construction begins<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">Professionals managing Red Book projects benefit from understanding design verification and supervision principles\u2014skills often covered in **Contract Management and Administration training**.<\/span><\/p>\n<h3><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>The Yellow Book \u2013 Design and Build<\/strong><\/span><\/h3>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">The **FIDIC Yellow Book**, officially titled **\u201cConditions of Contract for Plant and Design-Build\u201d**, shifts responsibility significantly. Here, the **Contractor designs and constructs** the project, taking greater control\u2014and greater risk.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">Key Features<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* The **Contractor handles both design and construction**.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* A **lump-sum price** is usually agreed upon at the outset.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* The **Engineer** still supervises but focuses more on compliance rather than direct design review.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Suitable for **mechanical, electrical, and process engineering works** such as power plants, desalination units, and treatment facilities.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">Risk Allocation<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">The contractor assumes **design risk**, performance guarantees, and often higher insurance obligations. The employer, meanwhile, benefits from a single point of responsibility.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">Ideal For<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* EPC (Engineering, Procurement, and Construction) projects<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Industrial plants and utilities<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Complex systems requiring contractor expertise<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">Mastery of the Yellow Book often comes with deeper understanding of **procurement strategies** and **technical risk control**, which are integral components of **Strategic Procurement Master** programs.<\/span><\/p>\n<h3><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>The Silver Book \u2013 Turnkey Projects<\/strong><\/span><\/h3>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">When employers want a fully completed facility delivered and ready for operation, the **FIDIC Silver Book**, or **\u201cConditions of Contract for EPC\/Turnkey Projects\u201d**, becomes the natural choice. It is often used for **large-scale private investments** and **infrastructure megaprojects** financed by international lenders.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">Key Features<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* The **Contractor designs, builds, tests, and hands over** a functioning facility.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* The employer\u2019s involvement is minimal\u2014essentially just setting performance targets.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* The contract is typically **fixed-price and fixed-time**.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* The Engineer\u2019s role is limited or sometimes even omitted.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">Risk Allocation<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">This is the **most contractor-heavy** contract. The contractor assumes nearly all risks, including unforeseen ground conditions, design performance, and delays. In return, they gain control over project execution without excessive employer interference.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">Ideal For<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Power plants, oil and gas facilities, manufacturing units<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Privately financed or PPP (Public-Private Partnership) projects<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Projects demanding guaranteed output performance<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">Professionals dealing with Silver Book projects benefit immensely from **Advanced Tendering Procedures and Bid Evaluation** courses to ensure contractors\u2019 offers fully capture hidden risks and costs.<\/span><\/p>\n<h3><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>The Gold Book \u2013 Design, Build, and Operate<\/strong><\/span><\/h3>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">The **FIDIC Gold Book**, officially known as **\u201cConditions of Contract for Design, Build, and Operate Projects (DBO)\u201d**, represents a modern evolution in FIDIC philosophy. It extends the contractor\u2019s role **beyond construction into long-term operation and maintenance**.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>Key Features<\/strong><\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Combines **design, construction, and operation** under a single contract.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* The **operation period** typically lasts 10\u201320 years.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Payments are often linked to **performance during operation**, ensuring sustainability.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Focuses on **whole-life project value** rather than short-term delivery.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>Risk Allocation<\/strong><\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">The Gold Book spreads risks across **design, construction, and operational phases**. Contractors manage performance and maintenance risks, while employers retain ownership and overarching oversight.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>Ideal For<\/strong><\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Water treatment plants<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Waste management facilities<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Infrastructure requiring continuous performance guarantees<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">Success in Gold Book projects requires integrated management of **engineering, finance, and facility operations**\u2014skills cultivated through **Leadership and Strategic Contract Administration** programs.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">Excellent \u2014 here\u2019s a **continuation of your professional FIDIC blog series**, written in the **same tone, flow, and structure** as your earlier pieces, now covering the remaining three: **White, Pink, and Blue Books**.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">Each section explains the background, purpose, risk structure, and ideal use cases with a consistent \u201cFIDIC leadership and project management\u201d style.<\/span><\/p>\n<h3><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>The White Book \u2013 Client\/Consultant Model Services Agreement<\/strong><\/span><\/h3>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">The **FIDIC White Book**, officially known as the **\u201cClient\/Consultant Model Services Agreement\u201d**, governs relationships between **clients and consulting engineers or design firms**. It is not a construction contract but rather a **professional services agreement** designed for consultancy engagements.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>Key Features<\/strong><\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Defines the **scope of professional services** such as feasibility studies, design, project management, supervision, and contract administration.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Sets out **fee arrangements**, payment schedules, and professional liability limits.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Covers **intellectual property, confidentiality, and dispute resolution** mechanisms specifically for consultancy work.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Can be used for both **domestic and international consultancy services**.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>Risk Allocation<\/strong><\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">The White Book carefully balances professional risk and client responsibility. Consultants carry obligations for due skill and care, not for guaranteeing specific outcomes. Clients, on the other hand, must provide timely information and decisions to avoid project delays.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>Ideal For<\/strong><\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Engineering design and supervision firms<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Consulting engineers, architects, and project managers<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Pre-construction and advisory service contracts<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">In today\u2019s complex project environments, professionals using the White Book benefit from **Legal Consultation Training** and **Professional Procurement Management** courses that strengthen contract drafting and negotiation skills for consultancy projects.<\/span><\/p>\n<h3><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>The Pink Book \u2013 Multilateral Development Bank (MDB) Harmonized Construction Contract<\/strong><\/span><\/h3>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">The **FIDIC Pink Book**\u2014formally titled the **\u201cMDB Harmonized Edition of the FIDIC Conditions of Contract for Construction\u201d**\u2014is a special adaptation of the **Red Book**. It was developed collaboratively between FIDIC and several **Multilateral Development Banks (MDBs)** such as the **World Bank, Asian Development Bank, and African Development Bank**.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>Key Features<\/strong><\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Specifically tailored for **projects funded by international financial institutions**.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Incorporates MDB-specific clauses related to **governance, anti-corruption, dispute resolution, and reporting obligations**.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Maintains the Red Book\u2019s general principles but includes modifications that reflect **donor agency compliance requirements**.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Enhances transparency and ensures fair competition for global tenders.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>Risk Allocation<\/strong><\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">Risk sharing follows the Red Book model, with employers responsible for design and site information. However, additional MDB clauses provide safeguards for equitable treatment of contractors, ensuring international standards of integrity and accountability.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>Ideal For<\/strong><\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Donor-funded infrastructure programs<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Public works financed by international banks<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Cross-border projects requiring strict compliance procedures<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">Professionals managing MDB-funded projects benefit greatly from specialized courses such as **Tender Evaluation Training** and **FIDIC Contract Administration** to ensure alignment with bank procurement guidelines.<\/span><\/p>\n<h3><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>The Blue Book \u2013 Dredging and Reclamation Works<\/strong><\/span><\/h3>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">The **FIDIC Blue Book**, officially titled **\u201cForm of Contract for Dredging and Reclamation Works\u201d**, addresses a highly specialized field: **marine and dredging projects**. These works involve unique technical and environmental risks that traditional FIDIC books do not fully accommodate.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>Key Features<\/strong><\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Tailored for **dredging, reclamation, and coastal engineering** projects.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Provides flexibility for both **unit-rate and lump-sum contracts**.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Covers essential aspects like **tide influences, marine equipment, disposal of dredged material, and environmental compliance**.<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* The Engineer maintains a key supervisory role similar to that in the Red Book, ensuring performance and quality control.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>Risk Allocation<\/strong><\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">The Blue Book balances risks by recognizing the unpredictable nature of marine conditions. Contractors manage dredging performance and methodology, while employers retain responsibility for environmental permits, site data, and access.<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>Ideal For<\/strong><\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">* Port and harbor construction<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Dredging channels and coastal defenses<\/span><br \/>\n<span style=\"font-family: arial, helvetica, sans-serif;\">* Land reclamation and beach nourishment projects<\/span><\/p>\n<p><span style=\"font-family: arial, helvetica, sans-serif;\">Given the complexity of these projects, professionals in this domain often pursue **Advanced Contract Management and FIDIC Claim Handling** training to handle the interplay between technical challenges and contractual obligations.<\/span><\/p>\n<h3><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>Global Application and Adaptation<\/strong><\/span><\/h3>\n<p><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">The Rainbow Suite\u2019s global adoption proves its practicality. From Africa\u2019s infrastructure corridors to Asia\u2019s power sector and the Middle East\u2019s megaprojects, **FIDIC\u2019s colored contracts** are the backbone of international project delivery.<\/span><\/p>\n<p><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">However, proper implementation requires tailoring the **Particular Conditions** carefully. Local legal systems, tax laws, and cultural considerations must integrate seamlessly with FIDIC\u2019s standardized framework. Organizations that invest in **Legal Consultation Training** and **Tender Evaluation programs** often navigate this adaptation process most effectively.<\/span><\/p>\n<h3><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>Common Challenges and Best Practices<\/strong><\/span><\/h3>\n<p><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">Even with their clarity, FIDIC contracts can go wrong if misunderstood.<\/span><\/p>\n<p><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">Copy-pasting amendments from past projects often creates contradictions.<\/span><\/p>\n<p><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">Ignoring notice procedures can invalidate claims.<\/span><\/p>\n<p><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">Weak documentation undermines both contractors and employers in disputes.<\/span><\/p>\n<p><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">Best practice dictates training teams in **FIDIC-specific Contract Management and Claims Handling** before project launch. Doing so ensures each stakeholder understands the obligations tied to their selected book.<\/span><\/p>\n<h3><span style=\"font-family: arial, helvetica, sans-serif;\"><strong>Final Thoughts<\/strong><\/span><\/h3>\n<p><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">Understanding FIDIC\u2019s colors means understanding **the logic behind global construction success**.<\/span><\/p>\n<p><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">Each color defines a unique philosophy, balancing control, risk, and collaboration differently. By choosing wisely\u2014Red, Yellow, Silver, or Gold\u2014project leaders create the foundation for fair, transparent, and efficient delivery across borders.<\/span><\/p>\n<p><span style=\"font-weight: 400; font-family: arial, helvetica, sans-serif;\">In an era where construction projects shape national economies, mastering the FIDIC Rainbow Series is no longer optional\u2014it\u2019s **a professional necessity** for every engineer, contract manager, and procurement leader.<\/span><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>","protected":false},"excerpt":{"rendered":"<p>The world of international construction depends on clear communication, fair risk-sharing, and structured project delivery. Yet, projects often face confusion [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":6573,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"site-sidebar-layout":"default","site-content-layout":"","ast-site-content-layout":"default","site-content-style":"default","site-sidebar-style":"default","ast-global-header-display":"","ast-banner-title-visibility":"","ast-main-header-display":"","ast-hfb-above-header-display":"","ast-hfb-below-header-display":"","ast-hfb-mobile-header-display":"","site-post-title":"","ast-breadcrumbs-content":"","ast-featured-img":"","footer-sml-layout":"","ast-disable-related-posts":"","theme-transparent-header-meta":"default","adv-header-id-meta":"","stick-header-meta":"","header-above-stick-meta":"","header-main-stick-meta":"","header-below-stick-meta":"","astra-migrate-meta-layouts":"set","ast-page-background-enabled":"default","ast-page-background-meta":{"desktop":{"background-color":"var(--ast-global-color-4)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"ast-content-background-meta":{"desktop":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"tablet":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""},"mobile":{"background-color":"var(--ast-global-color-5)","background-image":"","background-repeat":"repeat","background-position":"center center","background-size":"auto","background-attachment":"scroll","background-type":"","background-media":"","overlay-type":"","overlay-color":"","overlay-opacity":"","overlay-gradient":""}},"footnotes":""},"categories":[120],"tags":[],"class_list":["post-6572","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-blogs"],"acf":[],"_links":{"self":[{"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/posts\/6572","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/comments?post=6572"}],"version-history":[{"count":0,"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/posts\/6572\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/media\/6573"}],"wp:attachment":[{"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/media?parent=6572"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/categories?post=6572"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/keleaders.com\/ar\/wp-json\/wp\/v2\/tags?post=6572"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}